Descargar Imprimir esta página

Velleman KNS120 Manual Del Usuario página 11

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
12.4 EXPERIMENT 4 – Three LEDs in parallel connection
Wiring Sequence
2-18-16-6, 5-15-17-13, 14-1
6
16
18
5
15
17
- Complete all wiring connections as indicated in the sequence.
- Switch on the main switch to see all LEDs light up.
- When you switch off the main switch, all LEDs will be turned off.
12.5 EXPERIMENT 5 – Blower (Floating ball) and LED with separate switches
Wiring Sequence
2-4-6, 5-24, 3-14, 13-23-1
4
6
+
M
5
3
24
14
23
13
- Complete all wiring connections as indicated in the sequence.
- Switch on the main switch. The blower will blow.
- Press the push switch, the LED will light up.
- The blower and the LED are controlled by separate switches. Therefore they can be turned ON and OFF
separately.
12.6 EXPERIMENT 6 – Basic circuit operation of LEDs
Wiring Sequence
2-14, 13-16-23, 24-19-15-6, 5-20-1
6
100
24
19
15
16
23
13
- Complete all wiring connections as indicated in the sequence.
- Switch on the main switch. You will see that the small LED will light up but the large LED will not.
V. 01 – 19/01/2024
2
1
13
14
2
1
5
Ω
1
20
2
14
User manual
11
©Velleman nv

Publicidad

loading