12.26 EXPERIMENT 26 - Manual control stop-and-resume blower
Wiring Sequence
2-7-30-24,
23-26-22, 21-29-11, 12-8, 9-4, 3-10-25-13, 14-1
24
30
29
23
100μF
11
22 21
26
25
- Complete all wiring connections as indicated in the sequence.
- Switch on the main switch. After a while the blower will blow.
- Press the push switch, and the blowing speed will be changed for a while. Do not release the push
switch, and the speed will gradually back to the original blowing speed.
- And then release the push switch. The blower will stop for a while. After waiting for some time, the
blower will resume operation again like it did at the beginning of the experiment!
© COPYRIGHT NOTICE
The copyright to this manual is owned by Velleman nv. All worldwide rights
reserved. No part of this manual may be copied, reproduced, translated or reduced to
any electronic medium or otherwise without the prior written consent of the copyright
holder.
V. 01 – 19/01/2024
7
2
8
1
9
12
4
10
+
14
M
–
3
13
User manual
21
©Velleman nv