3.
INSTALL FINISHED WALL
For flush installations: Install
water-resistant wall material to
within 1/4" (6mm) of the
module edge. Install desired
trim (not provided) around the
unit to conceal the module edge.
Also install trim along the
bottom apron edge.
For alcove installations:
Install water-resistant wall
material around the unit to
conceal the module edge.
For ALL installations: Apply a
bead of silicone sealant to the
nailing-in flanges. Install
water-resistant wallboard with
the paperbound edge a
maximum of 1/4" (6mm) above
the finished, concave surface of
the module.
Tape, mud, and finish the wall
material. Seal the openings
around the valves and outlets
with plumbers putty.
A
1010410-2-
Flush Installation
2x4 Studs
1/4" (6mm) Gap
Water-Resistant
Wall Material
Alcove Installation
2x4
Studs
ALL Installations
Wallboard
1/4"
(6mm)
Max.
Paperbound
Edge Down
Concave
Surface
8
Kohler Co., Kohler, WI U.S.A.
Acrylic
Module
1" (2.5cm) x 2"
(5.1cm) Brace
Trim
Acrylic
Module
1" (2.5cm) x 2"
(5cm) Brace
1/4" (6mm) Gap
Water-Resistant Wall
Material
2x4
Framing
Furring Strip
Galvanized
Nail
Silicone Sealant