Descargar Imprimir esta página

GreenWorks Pro ULTRAPOWER 60V CS60L810 Manual Del Operador página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

6
7
4. Put the oil into the oil tank.
5. Monitor the oil window (7) to make sure that no dirt
gets into the oil tank while you add the oil.
6. Put the oil cap on.
7. Turn the oil cap clockwise and press the tab down to
close.
8. The whole oil tank will last for approximately 20- 40
minutes.
IMPORTANT
Do not use dirty, used or contaminated oil. Damage
can occur to the bar or chain.
8.3
ASSEMBLE THE GUIDE BAR AND
THE CHAIN
1. Switch off the chainsaw and engage the chain
brake.
2. Remove the battery.
3. Remove the chain cover nuts with the wrench (11).
4. Remove the chain cover (14).
14
5. Put the chain drive links (21) into the bar groove
(20).
6. Put the chain cutters (22) in the direction of the
chain operation.
English
11
9
7. Ensure the chain is put on in the correct direction
(do not assemble with the cutters backwards).
8. Put the chain in position and make sure that the
loop is behind the guide bar.
9. Hold the chain and bar.
10. Put the chain loop around the sprocket (16).
11. Make sure the chain tension pin hole (19) on the
guide bar fits correctly with the bolt (17).
12. Install the chain cover.
13. Tighten the chain. Refer to Adjust the chain tension.
14. Tighten the nuts when the chain is correctly
tensioned.
EN

Publicidad

loading

Este manual también es adecuado para:

2026202