Descargar Imprimir esta página

Water2Buy W2B 110 Manual De Instrucciones página 18

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 173
and 50mm from the top of the tank.
Add 3­4 litres of water into the tank on top of the salt.
I
Turn back on the mains water.
Plug­in your water2buy water softener.
Proceed with configuring the settings on your unit. Refer to your
product manual for guidance.
Check for leaks. We recommend regular checks for leaks for
the first 24 hours after install. IMPORTANT: Check for leaks at
all joints and connections after turning on the mains water.
After 3 hours check for leaks at all joints and connections. We
recommend a further check after 24 hours.

Publicidad

loading

Este manual también es adecuado para:

W2b 300W2b 700