Descargar Imprimir esta página

DAZE Dazebox Home Manual De Instalación página 13

Ocultar thumbs Ver también para Dazebox Home:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
08 - Wiring
T
S
EN
Prepare lines, neutral, and ground with the provided terminals before making connections.
Note: Failure to comply with this instruction will invalidate the product warranty. Refer to Chapter 14 - Warranty
Home T
Home S
For three-phase Dazebox Home, connect line 1 (L1), line 2 (L2), line 3 (L3), neutral (N) and grounding (PE), as indicated on the
card, to the spring terminals without the use of tools.
Note: In the case of installation in power sharing, you may be asked to rotate the lines L1, L2, L3 among the various chargers,
as indicated in the respective manual.
Home T
Home S
For single-phase Dazebox Home, connect line (L1) and neutral (N), without reversing them; connect the ground (PE).
13.

Publicidad

loading

Productos relacionados para DAZE Dazebox Home