Dip switch
1
2
0
0
0
0
0
0
0
0
0
1
0
1
0
1
0
1
1
0
1
0
1
0
1
0
1
1
1
1
1
1
1
1
10 - Connection to energy management system
10.1 - Dynamic Power Manager
Dazebox Home can be configured for operation with the Dynamic Power Manager (DPM), an optional device that allows the
charger to dynamically modulate the power dedicated to charging in order not to exceed the contractual power of the meter,
avoiding disconnections from the grid. This device is also compatible with photovoltaic systems.
The single-phase version of the Dynamic Power Manager can only be installed in single-phase installations, and vice versa for
the three-phase version.
Note: The installation of the DPM is not required for the operation of Dazebox Home, but in the absence of this device, it is not
guaranteed that the meter threshold will not be exceeded, resulting in disconnection from the grid.
Dynamic Power Manager connection
1P
R
3
4
Maximum current (A)
0
0
0
1
1
0
1
1
0
0
0
1
1
0
1
1
0
0
0
1
1
0
1
1
0
0
0
1
1
0
1
1
32
30
28
26
24
22
20
18
16
14
12
11
10
9
8
6.5
3P
After
Power Manager cable through
the designated cable gland, as
previously indicated, crimp the
RJ45 connector and Connect
it to the appropriate socket as
shown in figure R.
For more information on the
installation of the DPM, please
refer to the device manual inclu-
ded in the respective package
or available for download from
the website www.daze.eu. The
configuration of the Dynamic
Power Manager is done in the
App (see Chapter 11).
passing
the
Dynamic
15.
EN