1.6
CONNECTION OF
CONDENSATION
WATER TRAP
(fig. 5)
The drip board and its water trap must
be connected to a civil drain through a
pipe (ø 25) with a slope of at least 5 mm
per metre to ensure drainage of conden-
sation water.
The plastic pipes normally used for civil
drains are the only type of pipe which is
appropriate for conveying condensation
to the building's sewer pipes.
1.7
SHELL ASSEMBLY
(fig. 5/a - fig. 5/b)
The shell, the control panel and stainless
steel condenser kit are supplied separa-
tely, in individual carton packs.
The shell packaging contains the bag
with the water heater documents and the
glass wool already prepared to insulate
the cast iron body. The shell components
must be assembled according to the or-
der shown below:
- fasten the two supports (1) to the cast
iron body using hex head screws and
nuts;
- fasten the two corner supports (2) to
the sides of the shell using four self
6
4 x
8
7
4 x
1
tapping screws;
- insulate the cast iron body with the
glass wool supplied;
- only for the 2R HE 13 ErP model: install
the socket L=120 (22) in the reduced
lower plug (21); do not screw comple-
tely but leave 2-3 turns of thread free
to screw the socket (23) on the oppo-
site side. Screw the socket L=368 (23)
always in the same reduced lower cap
(21) supplied with the post-condenser
kit. N.B. it is not necessary to have a
hydraulic seal on the socket (23) but it
is sufficient to screw it only 2-3 turns
of the thread left free by the tube (22).
- mount the two reduced delivery-return
caps (21) on the cast iron body, sup-
plied with the post-condenser kit;
- mount the rear insulation panel (4);
- fasten the lower cross beam (3) to
the cast iron body with two hex head
screws;
4
2 x
11
6
5
1
KEY
1 Drain hose
2
2 Condensate drain tap
- fasten the sides (5-6) to the supports
(1) with four self-tapping screws and
lock them in the back using nuts inser-
ted on the tie-rods;
- install the upper rear panel (7-8) with
the four self-tapping screws supplied;
- fasten the control panel (9) to the
corners (2) with the four self-tapping
screws supplied;
- unwind the capillaries of the two ther-
mostats and of the thermometer by in-
troducing the respective probes in the
sheath (10), block everything with the
capillary stop clip supplied;
– mount the front cover (11) and the front
panel (12) on the sides;
- mount the post-condenser kit (14)
using the crosspiece (13) to position it
on the tie rods, securing it with the two
nuts. The post-condenser is fastened
to the crosspiece (13) with two bra-
ckets (15) and the screws;
9
2
2
9
10
2 x
1
12
2 x
3
2 x
Fig. 5
Fig. 5/a
29