Descargar Imprimir esta página

Craftsman professional PYT9000 Manual Del Operador página 20

Ocultar thumbs Ver también para PYT9000:

Publicidad

Idiomas disponibles

Idiomas disponibles

CUTTING DECK REMOVAL
To removethecuttingdeck, proceedas follows:
1.
Placethe PTO/BladeEngageknobin the disengaged(OFF)
positionand engagethe parkingbrake.
2.
Lowerthe deck by movingthe deck lift leverintothe bottomnotch
on the rightfender.
Locatethe PTOclutchunderthe frontof yourtractor.See
Figure10.
.
J
Figure10
Removethe beltguardand beltfrom the PTOpulleyas follows.
Referto Figure10:
a.
Removethe hexscrews.
b.
Pull the beltkeeperrod to the rightand downto remove.
c.
Removethe deck belt from aroundthe tractor'selectricPTO
clutch.
NOTE: If there is too muchtensionon thebelt for it to be easilyre-
movedfrom theelectric PTOclutch, cardully inserta 3/8" driveratchet
wrench(set to loosen)intothe squareholefoundin the left-handdeck
idler bracketand pivotit towardthe tractor'srightsideto relievetension
on the belt. See Figure11.
Avoidpinchinginjuries.Neverplaceyourfingerson the idler springor
betweenthe beltand a pulleywhileremovingthe belt.
.
InsertRatche;c
Here
_Y
Figure11
Lookingat thecuttingdeck from the leftside of thetractor,locate
the deck supportpin on the rear leftsideof thedeck.
2O

Publicidad

loading

Este manual también es adecuado para:

247.28981247.289810