Descargar Imprimir esta página

GE GFDS575 Manual Del Propietario E Instalación página 29

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
BOTTOM VENTING (cont.)
ADDING
A NEW DUCT
o Through the rear
opening, locate
the tab in the
middle of the
appliance
base.
Lift the tab to
about 45 ° using
a flat-blade
screwdriver.
Bend tab
up 45°
Reconnect the cut
Portion "A"
portion (A) of the
duct to the blower
housing. Make
Fixing
sure that the
shortened duct is
aligned with the
tab in the base.
Use the screw saved previously to secure the duct
in place through
the tab on the appliance
base.
Insert the/4" elbow
through
the bottom
opening and connect to
the dryer internal duct.
Be sure not to pull or damage
the electrical
wires
inside the dryer when inserting
the duct.
Apply duct tape as
shown on the joint
between the dryer
internal duct and the
elbow, and also the
joint between the
elbow and the bottom
duct.
J
Duct tape
Internal
duct joints
must be secured with tape;
otherwise,
they may separate
and cause a safety
hazard.
ADDING
COVER PLATE TO REAR OF CABINET
(BOTTOM
EXHAUST)
Plate -_'_"_'--_
/
(Kit WE1M454)
Connect standard
metal elbows and ducts to
complete
the exhaust system. Cover back opening
with a plate (Kit WE1M4541 available from your
local service provider. Place dryer in final location.
NEVER LEAVE THE BACK OPENING WITHOUT THE
PLATE. (Kit WEIH454.)
29

Publicidad

loading