• Mark the correct position of the holes and fix the ceiling bracket using the screws with metal
anchor or screws and washers suitable for the type of ceiling chosen.
• Check the correct installation of the bracket before hanging the fan. This plate must support the
full weight of the fan.
INSTALL ATI ON PRE PAR AT I O N
• To prevent personal injury and damage, en-
sure that the hanging location allows the
blades a clearance of 2.3 m from the floor
and 50 cm from any wall or obstruction.
• Be sure the outlet box is securely attached
to the building structure and can support
the full weight of the fan.
D OW NROD IN STAL L AT IO N
• Choose the suspension bar that best suits your situation: it has a 15 cm and a 25 cm suspension bar.
• Remove the bar bolt, removing the pin, and pass the canopy (roof trim) and the engine canopy
through the suspension bar. Next, route the fan motor cables through the inside of the suspen-
sion bar. Tighten the suspension bar to the engine and insert the bolt and pin.
Standard
mounting
style
Standard Mounting hangs from the ceiling
by a downrod.
INSTALLIN G THE HANGE R B R ACKE T
Please, drill an 8 mm in diameter hole on the concrete ceiling, and insert the bolt. Then, align the
bracket with the hole and tighten with a nut.
E NGL I SH
8
INSTALLATION INSTRUCTIONS
or nearest
obstruction
Support
brace
Wood
ceiling
50 cm
from wall
2.3 m from
blades to
floor
20°
20°
20°
20°
Angled
mounting
style
Angled Mounting recommended for a vault-
ed or angled ceiling.
Support
brace
Concrete
ceiling