Descargar Imprimir esta página

EMAK BT 3000 Instrucciones De Uso página 39

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

g) Install the chute
make sure that the 4 m8 nuts can be found in the grooves of the captive screws. Pass the chute strap over
these nuts and then let it down resting on the screws and tighten the nuts.
3) Fill with petrol
4) Fill with oil
Warning!
A "No Oil" label means that you must fill the oil tank. In all cases, check the level.
B&S 550 SERIES : 1,7 L
B&S 550 SERIES : 0,6 L
10 - EN

Publicidad

loading

Este manual también es adecuado para:

Sh 300