Descargar Imprimir esta página

Kermi IDN10 Instrucciones De Empleo página 6

Radiadores de diseño
Ocultar thumbs Ver también para IDN10:

Publicidad

Operating conditions
Maintain operating conditions for hot
water heati g i stallatio s accordi g to
V
ordnung für Bauleistungen [Construction
o tract Procedures
ai tai water s co ditio accordi g to
V
ssociatio o Ger a
Preve tio o da age i water heat-
i g i stallatio s
Observe limitations of use in damp loca-
tio s accordi g to
radiators
se radiator o l i closed heati g s ste s
Store and transport radiator only in the
rotective ac agi g
a e allowa ce or i i u cleara ces
etwee the radiator a d ad ace t arts
or air circulatio
For electrical accessory operation:
a e rotective areas accordi g to
i to accou t lso ollow all local
regulatio s
erate the heati g ele e t o l with the
voltage a roved (see rati g late)
Complaint
o tact the su lier
Disposal
Packaging and any parts that are not need-
ed should be recycled or disposed of prop-
erl
serve local regulatio s
Technical features
erati g ressure a ar
est ressure
low te
erature
ot water u to
for electrical accessory operation up to
80 °C
Electrical connection (for electrical acces-
sor o eratio )
Heating element preinstalled on the ra-
diator at the bottom right or left
Connection via electric set
Installation
With the heating element (IDN11) installed po-
sitio the radiator i such a wa that the ca le
is ot i ed or da aged
6
Verga e u d Vertrags-
gi eers
oati gs or
ar
(
)
Preliminaries (see Fig. 1–9)
For electrical accessory operation make sure
that a co ector soc et (
tion 16 A) installed according to regulation
is rese t withi the ra ge o the ca le
Check the delivery for completeness and
da age
Pre ositio re uisite tools
When installing, only remove protective
packaging at the fastening and connection
oi ts
crew the air ve t lug i
crew lo g aste i g screws i to the u er
sleeves a d tighte
crew s acer olts i to the lower sleeves
a d tighte
or electrical accessor o eratio
crew the heati g ele e t out
the side o which the heati g ele-
e t is to e i stalled screw the tee i
crew the heati g ele e t i a d tight-
V
e with
a accessories are su lied e g towel
rod i stall (see se arate i structio s)
ar drilli g ositio s (see ig )
rill holes a d seat dowel
crew the loc screws i the wall rac ets
out a d ull the holders out
aste the wall rac ets with lle screws
On doing so pay attention to the position
o the hole
sert the holders i the wall rac ets
doing so pay attention to the position of
the o e i gs
aste the holders with the loc screws ust
ger tight his wa the holders ca still
e ad usted or alig
Preinstall the bottom spacer (see Fig. 14)
Prei stall the setscrews i the s acer sleeve
Push the s acer sleeve with the slot to the
bottom onto the spacer bolt and if neces-
sar loc i to ositio with setscrews
stall oth s acers o the radiator
Mount the radiator and align (see Fig. 15–18)
Hook the radiator onto the holders past the
screws doi g so a e sure that the ra-
diator loc s i to lace
o alig the radiator laterall d ust the
holders
V use rotec-
tighte i g tor ue
e t

Publicidad

loading

Este manual también es adecuado para:

Idn11