Descargar Imprimir esta página

Milwaukee M12 FUEL 2554-20 Manual Del Operador página 18

Publicidad

Idiomas disponibles

Idiomas disponibles

WIRING INSTRUCTIONS- one of two
STEP 1: Insert light pipe in cavity of left housing halve-support.
STEP 3: Assemble PCBA into corresponding housing cavity as shown.
STEP 5: Install the pop switch into housing halve as shown. Route wires
through traps being sure wires are tucked completely down.
STEP 2: Assemble HV terminal over screw boss and route HV terminal
wire through channels and traps as shown.
STEP 4: Install LED lens and tuck LED wires down in housing cavity,
over HV terminal wire.
STEP 6: Assemble stator over pop switch wires. Be sure stator is seated
firmly and squarely in housing halve.

Publicidad

loading

Este manual también es adecuado para:

M12 fuel 2555-20M12 fuel 2555p-20