Descargar Imprimir esta página

Oase OptiMax 2000 Instrucciones De Uso página 24

Ocultar thumbs Ver también para OptiMax 2000:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
Commissioning/start-up
NOTE
Prevent the pump from running dry. Otherwise the pump will be destroyed.
Only operate the pump when it is submerged or flooded.
Switching ON/OFF
• Switching on: Plug the power plug into the outlet.
– The unit switches on immediately.
– Lay the mains cable so that a drip loop is formed and the lowest point is below the socket. This
prevents dripping water from entering the socket.
– Set the desired flow rate.
• Switching off: Pull the power plug from the outlet.
Form a drip loop
24
Set the flow rate
BSE0003
OIX0023

Publicidad

loading

Este manual también es adecuado para:

Optimax 3000Optimax 4000Optimax 5000