Descargar Imprimir esta página

Amana AFD2535DEB Guía De Uso Y Cuidado página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Connecting the Water Supply
Materials
Needed
• Y4"outer diameter flexible copper tubing
• Shut-off valve (requires a X" hole to be drilled into
water supply line before valve attachment)
• Adjustable
wrench
• Y2' hex nut driver
Note
• You should only use copper tubing for installation.
Plastic is less durable and can cause damage.
• Add 8'
supply
to tubing
length needed to reach water
for creation of service loop.
Create service loop with copper
tubing
(minimum
2' diameter).
Avoid kinks in the copper tubing
when bending it into a service
loop.
Do not use plastic tubing.
2' diameter
minimum
2. Remove plastic cap from water valve inlet
port.
Place brass nut (A) and sleeve (B)
on copper tube end as illustrated.
Reminder:
Do not use an old
sleeve. The nut and sleeve are
provided
in the use and care packet.
Place end of copper tubing into water
valve inlet port. Shape tubing slightly. Do
not kink - so that tubing feeds straight
into inlet port.
5. Slide brass nut over sleeve and screw nut
into inlet port. Tighten nut with wrench.
U MPORTANT:
Do not overdghten.
Cross
threading
may occur.
A
B
Pull on tubing to confirm
connection
is
secure. Connect tubing to frame with
water tubing
clamp (C} and turn on
.....
water supply. Check for leaks and
correct if necessary. Continue to
observe the water supply connection
for two to three hours prior to moving
the refrigerator
to its permanent
location.
7_ Monitor water connection
for 24 hours. Correct
leaks, if necessary.

Publicidad

loading

Este manual también es adecuado para:

Afd2535des