ASSEMBLY INSTRUCTIONS
8. Constructing the Side Partitions
• Attach Left Upper Partition (I) to Left Upper
Front Panel (F), inserting the pre-installed
hardware on the edges of Left Upper Partition
(I) into the pre-drilled holes on Left Upper Front
Panel (F).
• Repeat these steps to attach the Right Upper
Partition (L) to Right Upper Front Panel (J).
9. Preparing the Flip Down Door
• Prepare the Flip Down Door (M) by attaching
the Right Pin Hinge (GG) and the Left Pin Hinge
(HH), using Screws (FF) as shown.
Hardware Used
Right Pin Hinge
GG
Left Pin Hinge
HH
Ø3.5x12mm
FF
Screw
10. Preparing the Flip Down Door
• Continue preparing the Flip Down Door (M) by
attaching the Gas Springs (EE), using Screws
(FF) as shown.
Hardware Used
Gas Spring
EE
Ø3.5x12mm
FF
Screw
28WM373 REV2.0
x1
x1
x4
x 2
x 4
12
8
I
F
9
GG
10
L
J
HH
M
M