Descargar Imprimir esta página

Bosch Rexroth HQ 2/U Instrucciones De Montaje página 53

Unidad de elevación y transporte transversal

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 155
1
2
7 Assembly
7.1 Unpacking
Lift the product out of the packaging.
Dispose of the packaging in accordance with the currently applicable
national regulations in your country.
7.2 Installation requirements
When installing the product, always observe the ambient conditions
specifi ed in the Technical Data (see page 37).
7.2.1
Mounting orientation
The product should be aligned and level at right angles and parallel to the axis.
This ensures correct functioning and prevents premature wear.
7.2.2
Mounting with T-bolts
• Mount the transfer systems TS 1, TS 2plus, TS 2pv, TS 4plus, TS 5 and chain
conveyor systems VarioFlow and VarioFlow S with T-bolts and fl ange nuts.
• Make sure the T-bolt is in the correct position when inserting and tightening
in the slot. The notch at the end of the bolt indicates the T-bolt orientation.
1 = T-bolt insertion orientation in the slot.
2 = T-bolt clamping position in the slot.
Maximum tightening torque: 25 Nm.
7.3 Required tools
• Hexagon wrench WS13
• Hex socket wrenches WS3, WS4, WS5
• Screwdriver for recessed head screws PZ2
• Hammer
• Water level
3 842 546 879/2015-07, MIT: HQ 2/U, Bosch Rexroth AG
Assembly
15/38

Publicidad

loading