Descargar Imprimir esta página

Waeco AirCon Service Center BMW 2500G Instrucciones De Uso página 108

Estación de mantenimiento de aire acondicionado

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Operation
8.8.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection: Select LP / HP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Press ENTER to confirm.
3. Select whether after the filling process a trial run of the air condition-
ing unit should be carried out or not.
Press ENTER to confirm.
4. Once all settings have been entered, press ENTER to start the
process.
8.8.5
After ending the air conditioning service
✓ After the air conditioning service has finished, you will be prompted to
disconnect the hoses of the AirCon Service Center from the vehicle air
conditioning system.
1. Disconnect the service hoses (11) and (12) and press ENTER to
confirm.
✓ The service hoses will now be drained. The device is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
108
HP/LP
PORT
HP
PORT
LP
PORT
ENTER-OK STOP-EXIT
A/C System test
at the end?
Process start?
ENTER-OK STOP-EXIT
BMW 2500G
Yes
No
EN

Publicidad

loading