Descargar Imprimir esta página

GYS SMART HUB MODULE Manual De Instrucciones página 16

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
Operating manual
Usage
1
Switch on all Gysflash units
Check that the Gysflash units are correctly connected to the SHM (see Installation section).
2
Use the Gysflash Master interface to con trol the multi-charger.
3
To ensure optimal equalisation, we recommend connecting the clamps of each charger directly to
the terminals of each battery (without any intermediary cables).
TROUBLESHOOTING
Err27: Cable_NOK
Err28 : COM_NOK
Err31 : COM_NOK
Err32 : Unbalanced
FIXING
There are two mounting options:
 to the wall (screws not supplied)
1
16
Translation of the original
instructions
Multi-charger mode:
Parallel connection of charging
cables failed
Multi-charger mode:
Communication failure between
chargers
Multi-charger mode:
Gysflash connected on the wrong
SHM channel
Equalize mode:
Unbalanced batteries
168 mm
Charging cables to be replaced.
Poor connection, check assembly (PHM).
No communication, check SHM assembly and SLAVE X
charger configuration.
Replace DB9 cable(s).
Check that the Master Gysflash is installed on channel 1
of the SHM, and that the Slave Gysflashes are installed on
the other channels.
To revert back to single-charger operation, press the
START/STOP button, enter the administrator code, and
select OFF for the Multi-charger function.
Ensure that none of the batteries are faulty.
SMART HUB MODULE

Publicidad

loading