Descargar Imprimir esta página

RedMax EBZ9000 Manual Del Usuario página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

To assemble the tube and handle on
the product (EBZ9000RH)
1. Use the clamp (A) to attach the flexible hose (B)
and the throttle cable to the the pipe angle. Make
sure that the throttle cable is placed in the groove
on the inside of the clamp.
A
2. Make sure that the clamp screw is on the
top of the tube. Hold the clamp in the correct
position, push the screw into the clamp and
tighten the screw. Make sure that the routing of
the throttle cable go along the tube as shown in
the illustration.
3. Use the clamp (C) to attach the control pipe (D)
and the throttle cable to the flexible hose. Make
sure that the throttle cable is placed in the groove
on the inside of the clamp.
10
B
C
D
4. Make sure that the throttle cable is on the top of
the tube. Hold the clamp in the correct position,
push the screw into the clamp and tighten the
screw.
5. Align the marks of the 3 lines on the standard
nozzle (E) and on the control pipe (D).
D
6. Push the standard nozzle onto the control pipe.
Turn the standard nozzle to lock it in position.
Note:
You can lubricate the standard nozzle
and the control pipe to make them easier to
assemble.
To adjust the handle position
A correctly adjusted handle and product makes
operation easier.
E
2318 - 003 - 02.04.2024

Publicidad

loading

Este manual también es adecuado para:

Ebz9000rh970 55 07-01970 55 06-01