7)
Setting the switch.
4.3. Multi booster Start-up and test
1)
Set switch to 1, 2 or 3 depending on which number in the row the pump is (counting from the controller).
2)
Install new communication cables for flow and modbus data from pump 1 to 2 to 3.
Install the motor cable and the motor temperature cable.
3)
Start the water supply to the pump. Check for any leakages.
4)
Bleed the pump.
5)
Install the power cable wires marked with the numbers 1-3, and turn on the system. Please also see il
lustration above.
6)
Wait for the OFF LED to emit constant light (20-30 seconds).
7)
Installation on display
- Set the display for the correct machine type in settings. The type of machine is stated on the identifica
tion plate.
- Set the time and date in settings
- Set user-specific settings
8)
Test the unit.
16