Descargar Imprimir esta página

Glacier bay FW0A0000CP Guía De Instalación Y Cuidado página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Attaching the quick connecting
hose
Remove the cap from the quick connect tubes.
Attach the quick connecting hose (I) connections to
the hot faucet handle (A) connection, faucet body (J)
connection, and cold faucet handle (K) connection.
Push until the connections snap together.
Pull down moderately to ensure the connection
has been made.
J
A
Operation
1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
the aerator.
Ensuring the handles are in the off position, turn
on the water supply and check for leaks. If you
discover any leaks, check your connections to
ensure they are installed properly.
Use a coin to remove the aerator (B) from the
faucet (J). Turn on the hot and cold handles to al-
low the water to run for at least one minute. This
flushes away any debris that could cause damage
to internal parts.
Turn off the water and reinstall the aerator and
housing (if applicable).
K
I
Do not lose the gasket in
10
Connecting the supply lines
Use 1/2 in. I.P.S. faucet connections (1), or a
3/8 in. O.D. ball-nose riser (2) with supply line
coupling nuts (3) (not included).
Use two wrenches to tighten the connections.
Do not over tighten or torque the copper supply
line.
1
A
B
8
2
3
J
K

Publicidad

loading

Este manual también es adecuado para:

277-531