INSTALLATION MEASURES
To carry out a proper installation of the operator parts as well as
to ensure the best automation performance, the measurement
levels shown in the following table shall be complied with.
Change the gate structure to adapt it to one of the cases in the
table, if necessary.
A
C
g
B [mm]
20 ÷ 40
50 ÷ 80
90 ÷ 140
150 ÷ 160
90°
170 ÷ 180
180 ÷ 220
220 ÷ 250
250 ÷ 320
20 ÷ 60
70 ÷ 110
100°
110 ÷ 150
150 ÷ 200
20 ÷ 50
110
50 ÷ 100
110 ÷ 130
g g
A [mm]
C [mm]
140
650
140
650
150
650
160
650
180
650
180
650
180
600
200
600
170
650
180
650
190
650
200
650
180
650
200
650
210
650
ENGLISH - 13 -