Descargar Imprimir esta página

Hilti HCS T1-B Serie Manual De Instrucciones página 31

Publicidad

Idiomas disponibles

Idiomas disponibles

5.3
Setting up gateway
1. Read and follow the instructions on safety and use in the operating instructions of all system products.
2. Select a flat and dry location with the best possible protection against dirt and damage. The installation
location should have a constant electricity supply and be within a maximum of 300 m (1000 ft) of the
planned sensor locations.
3. Remove the gateway, and if applicable a tripod, from the packaging.
4. Use without tripod → Set up the gateway.
5. Use with tripod → Set up the tripod level and plumb.
6. Secure the legs and feet of the tripod and check that it is stable.
7. Install the gateway on the tripod.
8. Connect the gateway to the AC supply.
*2399131*
2399131
English
25

Publicidad

loading

Este manual también es adecuado para:

Hcs t2-b serieHcs t1Hcs t2Hcs