Descargar Imprimir esta página

Dometic Skyview Powered/Chain Instrucciones De Montaje Y De Uso página 13

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
Skyview
➤ Fix the hold down according the chosen option:
– Dome mounted hold down (A)
– Flush mounted hold down (B)
– Extended guide wire hold down (C)
9.4
Fitting the side track versions (only powered version)
➤ Proceed as shown:
– BR leaflet: fig. 0 to fig. a
– MP leaflet: fig. 0 to fig. a
– CA leaflet: fig. 0 to fig. a
9.5
Electrical installation (only powered version)
Proceed as follows:
1. Check the voltage of the blind (see cable label).
2. Decide on the routing of the motor wire.
3. Choose a location for the control device.
4. Mount the control device at the chosen location.
5. Connect the blind according to the wiring diagrams for 12 Vg/24 Vg or
110 Vw/ 230 Vw (see DIAGRAMS leaflet).
Key to wiring diagrams (see DIAGRAMS leaflet)
Pos.
Description
1
Power supply
2
Head rail
3
Head rail motor options
4
Junction box
5
Single pole double throw center off switch SPDT-CO
(110 Vw/230 Vw only)
bk
black
bn
brown
bu
blue
gn
green
or
orange
EN
Installation
13

Publicidad

loading

Este manual también es adecuado para:

9600023471