Astralpool PRO ELYO INVERBOOST NN Serie Manual Del Usuario página 22

Bomba de calor para piscina
Ocultar thumbs Ver también para PRO ELYO INVERBOOST NN Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 167
5.2 Check-valve installation
NOTE
Note: If automatic dosing equipment for chlorine and acidity (pH) is used, it is essential to protect the heat
pump against excessively high chemical concentrations which may corrode the heat exchanger. For this reason,
equipment of this sort must always be fitted in the piping on the downstream side of the heat pump, and it is
recommended to install a check-valve to prevent reverse flow in the absence of water circulation.
Damage to the heat pump caused by failure to observe this instruction is not covered by the warranty.
5.
5.
5.
Location
Location
Location
and
and
and
- 18 -
connection
connection
connection

Publicidad

Tabla de contenido
loading

Tabla de contenido