Best IPB9 Manual De Instrucciones página 8

Ocultar thumbs Ver también para IPB9:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EXTERIOR AND IN-LINE BLOWER SELECTION IPB9E Series
CAUTION: To reduce risk of fire and electric shock, install this range hood only with
Exterior Blower Models EB6, EB9, EB12 or EB15, and
ILB9 or ILB11. Other blowers cannot be substituited.
The blower must be UL listed for Canadian and U.S. use, and evaluated for use with solid state
speed control, rated 120V, 60 Hz, 6.0 A max.
INSTALL THE DUCTWORK IPB9E Series
NOTE: To reduce the risk of fire, use only metal ductwork.
1. Choose the location where the Exterior Blower or In-Line Blower will be mounted. See
illustrations below for mounting location suggestions and restrictions.
2. A straight, short duct run will allow the hood to perform most efficiently.
3. Long duct runs, elbows and transitions will reduce the performance of the hood. Use as
few of them as possible. Larger ducting may be required for best performance with long
duct runs.
4. After the Exterior or In-Line Blower has been installed, connect round metal ductwork
and work back towards the hood location. Use duct tape to seal joints between ductwork
sections.
SUGGESTED MOUNTING LOCATIONS
OK
OK
EXTERIOR BLOWER
CAUTION: MAY NOT FIT
UNDER EAVES OF SINGLE
STORY HOMES
In-Line Blower Models ILB3, ILB6,
Best
10" ROUND
DUCT
10"ROUND
DUCT
DECORATIVE
FLUE
24" TO 36" ABOVE
COOKING SURFACE
- 8 -
Best
EXTERIOR
BLOWER
HOOD
FIG. 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ipp9e42sb

Tabla de contenido