Insulation Shell - Grundfos UP XL Serie Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.4 Insulation shell

For pumps with provided insulation shell, the
following procedures are required to insure safe
and proper installation.
1. Pump and mating piping flange bolts need to
be installed towards the pump as illustrated
in fig. 4.
2. Apply water proof, heat resistant, silicon
based sealant to insulation shell. Care
should be taken to not block weep slots for
pump motor when applying sealant. Failure
to follow proper sealant location procedures
could damage motor and insulation shell.
See fig. 5 for proper locations when applying
sealant.
3. Mate the two insulation shells over the pump
volute as illustrated in fig. 6. If the shells do
not mate; flange bolts are installed in the
wrong direction, review step one and or
switch mating shell location.
4. Proper amount of time should be allowed for
sealant to set-up before any additional
installation work is performed. See sealant
manufactures recommended time for sealant
set-up. See fig. 7 for final configuration.
Insert flange bolts
toward pump
Insert flange bolts
toward pump
Fig. 4
Connect pump to piping, installing
flange bolts toward the pump
Do not block
weep slots
Do not block
weep slots
Fig. 5
Applying silicon sealant (dotted
areas indicate sealant)
Fig. 6
Insulation shell installation (dotted
areas indicate sealant)
Fig. 7
Ready for insulation wrap
9

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ups 26-150Ups 43-100Ups 50-60

Tabla de contenido