1.
Start the charge
acceptance test
2.
3.
4.
5.
Charger detects that the battery is connected, carries out a self-test and starts the
charge acceptance test.
Starting the
1.
charge accep-
tance test manu-
ally
2.
3.
If there is no confirmation of correct pole connection within 2.5 secs, the device reverts
to menu mode.
Select charge acceptance test mode
Charge acceptance test
Set the capacity of the battery to be tested
Connect (+) charging terminal to positive pole on battery
Connect (-) charging terminal to negative pole on the battery, or to vehicle body (e.g.
engine block) in the case of vehicle electrical systems
Self test
Once the charging terminals are connected, press start/stop button for approx. 5 secs
WARNING! Risk of serious damage if the charging terminals are connected
incorrectly. The reverse polarity protection facility is inoperative if the current
input test is started manually (battery voltage < 1.5 V). Connect charging
terminals to correct poles and ensure proper electrical connection to vehicle
terminals.
Ensure charging terminals are connected to correct poles
Start test
Charge acceptance test