EXISTING CONSTRUCTION (JOIST/ABOVE CEILING ACCESS APPLICATION) INSTALLATION
INSTRUCTIONS
8. Insert four hanger bars (C) to the housing (A).
9. Connect the round ductwork (not included) to the duct
adaptor (D) and secure with duct tape (not included) or
clamps (not included). Then attach the duct adaptor
(D) to the housing (A) by inserting the hooks of the duct
adaptor (D) into the slots on the housing (A), and using
the duct adaptor screw (II), tighten the duct adaptor
screw (II) securely.
Hardware Used
0
Duct Adaptor Screw
()II
X
1
1 0. Place two clips (BB) along the bottom edge of each
side of the housing (A). Place the housing (A) into the
opening, then mount the housing (A) to the joist.
Note: The clips (BB) will ensure the bottom edge of the
housing (A) is flush with the ceiling board.
Hardware Used
~Clip
~
x4
13
•
~
UTILITECH'
]
Lowes
.com
~
- · - :