Protec ECOMAX Manual De Instrucciones página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation
4. Connecting the processor
Water connection: Connect the water hose which comes out from the processor's
back to the fresh water supply.
All other hoses (see diagram page 14): First cut off the pre-installed hoses at the
film processor so that the angle stubs protrude somewhat beyond the edge of the
table (see figure). Connect the enclosed hoses at the front of the machine accord-
ing to the colour system. Put hose clip (enclosed in accessory bag) over hose end,
before attaching to connection. Warm up hose end (with hot water or lighter) and
push onto the respective connection. Finally push clip over hose and connection.
Cut hoses to required length. Then integrate the stop cocks into the three drainage
hoses in such a position, that they are easy to reach.
Using the hose clips, connect the suction pipes to the ends of the hoses for the re-
plenishment tanks. Feed the suction pipes through the cover opening into the re-
spective replenishment tanks and snap them in to place.
The overflow and drainage hoses from the developer and fixer should be guided
into their respective collecting containers.
The overflow and the drainage of the water can either be guided into the drainage
syphon or into respective collection containers.
13
ECOMAX
TM

Publicidad

Tabla de contenido
loading

Tabla de contenido