Protec ECOMAX Manual De Instrucciones página 21

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Maintenance / Disposal
Attention:
Never start the machine up unless it is filled with liquid!
Recommended Maintenance Work:
1.
Functional check
film intake / film transport / replenishment / bath heating / dryer heating / water supply
2.
Cleaning
2.1. Switch off machine, remove cover
2.2. Empty all three tanks
2.3. Close drain cocks and fill tanks with water
2.4. Install cover, switch machine on
2.5. Fill two additional containers with water, place the suction pipes in these containers and activate the film intake
until the replenishing system is filled with water
2.6. Switch machine on for a few minutes
2.7. Switch machine off
2.8. Empty all tanks
2.9. Prepare tank cleaning agent for developer and water tank according to manufacturer´s instructions
Attention:
Do not use chlorine containing cleaning agents!
2.10. Fill developer and water tank with tank cleaning agent (do not use the replenishment pumps to do so)
2.11. Fill fixer tank with water
2.12. Place suction pipes into empty tanks
2.13. Install cover, switch machine on
2.14. Wait until the operating temperature is reached, (observe information concerning temperature, time, cleaning
procedure contained in the datasheet of the tank cleaning agent)
2.15. Activate the transport (activate film intake)
2.16. After approx. 15 minutes (observe information concerning temperature, time, cleaning procedure contained in
the datasheet of the tank cleaning agent) switch film transport off
2.17. Remove cover, neutralise developer tank (observe information concerning temperature, time, cleaning proce-
dure contained in the datasheet of the tank cleaning agent)
2.18. Switch machine off
2.19. Empty all three tanks
2.20. Fill machine with water and switch it on
2.21. Put suction pipes into vessels with water
2.22. Activate the film intake until the replenishing system is filled with water
2.23. Check all pumps for tightness
2.24. Switch machine off
2.25. Drain tanks
2.26. Fill tanks 3/4 with water
2.27. Switch machine on
2.28. Activate film transport for a few minutes
2.29. Switch machine off and drain all three tanks
2.30. Repeat item 2.20 to 2.29 if required (observe information e. g. regarding temperature, time and cleaning proce-
dure outlined in tank cleaner datasheet)
ECOMAX
TM
23

Publicidad

Tabla de contenido
loading

Tabla de contenido