Installation
6
Installation
A
NOTICE!
The air conditioning roof unit may only be installed by qualified
personnel from a specialist company. The following information is
intended for technicians who are familiar with the guidelines and safety
precautions to be applied.
6.1
Notes on installation
These installation instructions must be read completely prior to the
installation of the air conditioning roof unit.
The following tips and instructions must be observed wile installing the air
conditioning roof unit:
!
WARNING!
Ensure that all electrical components are electrically discharged before
carrying out work on them.
Always check whether any vehicle components could be damaged or
their operation impaired by the unit before installing the air condition-
ing roof unit. You can use fig. 1, page 3 to check the dimensions of
the installed unit.
The supplied assembly parts must not be modified during installation.
The ventilation slots (grill) may not be covered (minimum distance
from other attachment parts: 10 cm).
For installation and repair work, adhere to the corresponding rules of
technology.
When installing the system and making the electrical connections,
observe the guidelines from the body manufacturer.
Use appropriate tools for each step of the installation.
Prior to and during drilling, note the location of existing cable
harnesses, cables and other components.
!
WARNING!
Before installing the air conditioning roof unit, the power supply at the
battery of the vehicle must be disconnected.
Non-observance of this regulation can result in danger of electrocution.
28
FreshAir HDE
EN