Installation
➤ Check the output voltage of the three phase generator (14 – 15 V).
➤ Check the efficient functioning of all electrically operated vehicle
components.
➤ If deviations are identified, please inform workshop management or
the vehicle owner.
6.2.2
Preparing the unit fastening
➤ Place the unit on the roof and make sure that the roof area of the cabin
is level (fig. 2, page 3).
➤ Check whether the cut-out sections for the air inlet and outlet and the
installation of the cover can be completed inside the cabin.
➤ Remove the cover of the air conditioning roof unit.
➤ Mark the six fastening holes Ø 10 mm (fig. 3 1, page 4).
➤ Mark the rectangular opening for the air inlet (fig. 3 2, page 4).
➤ Mark the rectangular opening for the air outlet (fig. 3 3, page 4).
A
NOTICE!
Check that under the roof plate there are no electric wires, lining or
vehicle facilities near the holes.
➤ Perform the holes and the openings (fig. 4, page 4).
➤ Protect the holes and the openings with antioxidant.
6.2.3
Attaching the seal
A
NOTICE!
Ensure that the adhesive surface for the seal between the unit and the
cab roof is clean (free of dust, oil, etc.).
➤ Apply sealing or something similar to prevent any water from getting
between the holes and the air vents (fig. 5, page 5).
30
FreshAir HDE
EN