Scope Of Delivery; Holder Assembly; Control Unit Assembly; On/Off Switch Assembly - Waeco MagicSpeed MS-ir2 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
MS-ir2
24/06/03
The following are required for the installation and assembly:
– measure (see
– prick punch (see
– screwdriver (see
The following are required for the electrical connection and the check:
– diode test lamp (see
or a voltmeter (see
– insulation tape
Quantity Designation
1
Control unit (see
1
Electronic module (see
2
Belt webbing (see
1
Holder (see
1
ON/OFF switch (see
1
Receiver (see
1
Cable harness (see
3
Adapter (see
6
Double-sided adhesive tape (see
4
Label (see
1
Plug casing (see
2
Bolts (see
(see
D
(see
E)
(see
F
(see
G
15:27
Page 23
Necessary tool
B 1)
B 2)
B 3)
A 1)
B 6)

Scope of delivery

C 1)
C 2)
C 3)
C 4)
C 5)
C 6)
C 7)
C 8)
C 10)
C 11)
C 12)

Holder assembly

Control unit assembly

ON/OFF switch assembly

Receiver assembly

– drill bits (see
B 7)
– drill (see
(B 8)
– solder (see
A1)
– soldering iron (see
Article No.
MS-IR-TX
MS-IR-EM2
MS-IR-GB
MS-IR-HA
MS-IR-SW
MS-IR-RX
MS-IR-KA2
MS-IR-AD
C 9)
MS-IR-ST
23
B 5)

Publicidad

Tabla de contenido
loading

Tabla de contenido