Installation
• Release the operator (Fig.12).
• Loosen the fi xing screws of the protective casing of the
operator and remove the casing (Fig.13).
• Position the operator on the fi xing slab and anchor in place
using the supplied nuts and washers (Fig.14-ref.A).
• Adjust the height with respect to the ground.
• Tighten the nuts using a socket spanner.
5.1-B Fixing with screw anchors
Warning
This method for fi xing is allowed only if an horizontal
area of good fi rm cement has already been prepared
where the operator is to be fi xed.
Caution
•
The operator must be well aligned to the sliding gate
and at a correct distance from the resting surface
of the rack (Fig.14).
•
Use all the fi xing points (4 holes) to ensure that the
operator is fi rmly anchored to the terrain.
•
Use SCREW ANCHORS FOR COMPACT MASONRY
(Fischer S 10 RS 100 screw anchors, or equivalent).
• Use a pencil to mark the position of the holes on the
anchoring surface, using the foundation slab as a
template (Fig.15).
• Make holes for the screw anchors up to aprox 120 mm
deep (Fig.16) (placing the operator in a sheltered place
away from dust).
• Position the operator on the holes, insert the screw
anchors (Fig.17-Ref.A) and tighten slightly.
ATTENTION: in order to insert the 4 screw anchors, it may be
necessary removing the power transformer (Fig.17-Ref.B)
by tightening the relevant fi xin screws. Replace the power
transformer at the end of operator fi xing.
• Check the distance between the operator and the gate
(Fig.15) before fully tightening the anchor screws.
Fig.16
Fig.17
B
2
A
1
- EN 6 -
Fig.12
Fig.13
A
Fig.14
Fig.15
3
2
3
2
1
A
1