IMPORTANT: For proper installation and smooth operation, the valve must
be level and square to the finished wall.
• Install the valve so that the outside surface of the finished wall will be
between the Max and Min markings on the plaster guard.
• Make sure the valve is installed with the small arrow pointing in the
direction of water flow.
• Dashed pipework and fittings shown are not included.
•
The plaster guard should remain in place until you are ready to install the trim.
(SHOWERHEAD RECOMMENDED)
INSTALLATION PROCEDURE
OUTLET 1
OUTLET 3
MIXED WATER
INLET
2 1/2" [65mm] MIN
3-3/4" [95mm] MAX
OUTLET 2
ARROW MUST
POINT UP
FINISHED WALL
SURFACE
MIN./MAX.
MARKINGS
4