7.3 Maintenance schedule
8
3
6
5
2
Figure 7.1 Maintenance item overview
Maintenance item Interval / maintenance activity
Daily
1
Emptying the waste container
Weekly
2
Cleaning wire-holding tongs
3
Stranded wire fixing unit: Cleaning insertion funnel
4
Servicing stripping unit, checking stripping blade
5
Cleaning the interior
Monthly
2
Wire-holding tongs: Oiling the pivot point and contact areas
3
Stranded wire fixing unit: Oil pivot point and rollers
6
Crimp tool: Rollers and ferrule-holding tongs
Quarterly
7
Tool slide
8
Servicing transport unit
As required
9
Compressed air maintenance unit:
Draining condensate; cleaning/changing filters
2583060000/00/03.2018
Cleaning and maintaining the machine
4
7
9
1
See section
7.4
7.5
7.6
7.7
7.9
7.5
7.6
7.8
7.10
7.11
7.12
39