Tools Needed; Overview Of Gate Operator And Wiring For Control Box - LiftMaster LA350 Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INTRODUCTION

Tools Needed

Overview of Gate Operator and Wiring for Control Box

Cables used must meet all National and Local Codes for outdoor use.
FA70LM
Control Box
Power Cable:
2 X 1.5 mm2
Cable for
Photoelectric
Sensor:
4 X O.5 mm2
or 2 X O.5 mm2
(optional)
LA350
Gate Operator
with 1000 mm
cable
Cables for
MOTO1
& MOTO2:
2 X 1.0 mm2
Cable for Flashing
Light: 2 X 1.O mm2
(optional)
FA42LM
Flashing Light
(optional)
FA31LM Photoelectric
Sensor (optional)
Remote
Control
7
FA31LM Photoelectric
Sensor (optional)
LA350
Gate Operator
with 1000 mm
cable
Junction Box
(not supplied)
Cable for
Extension Cables
Photoelectric Sensor:
for MOTO2:
4 X O.5 mm2 or
2 X 1.0 mm2
2 X O.5 mm2 (optional)
(not supplied)

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido