D
(6.3mm)
(813mm - 914mm)
A
B
115 V
115 V
15 AMP
20 AMP
E
C
230 V
230 V
15 AMP
16 AMP
-12-
INSTALLATION
1. Remove all packing material from chamber.
2. Place unit on a level countertop.
Adjust feet (A) so that front of unit is 1/4" higher than rear. If front
is too low, unit will not dry properly. If too high, it can damage the
heating element.
3. Install filter tube (B) in the location shown. Turn filter to touch the
bottom of the chamber.
4. Install air tube (C) into the rear fitting as shown.
5. Peel protective cover from tape on top of casing and place
operating instruction card (D) (with the appropriate language for
the operator, facing up) on the tape and press down firmly.
NOTE: If unit has been stored in cold conditions, allow it two hours
to warm up to room temperature before operating.
NOTE: If unit is not to be used for extended period of time. Turn
OFF main power switch located in the back of unit.
6.
Plug power cord into a receptacle that is on a dedicated circuit,
fused, for the maximum power of the unit. Properly install per your
local electrical codes. (See illustration E).
IMPORTANT: Carefully read the Programming Set-up instructions
and program unit accordingly. (Refer to page 14). The unit has a
special automatic preheat mode that warms chamber for quicker
cycle times, between 0600 and 1800 hours.