Decommissioning; Decommissioning Procedure; Disposal; Disposal/Recycling - Baxi PRIME 24 Manual De Uso

Caldera mural de gas de condensación
Ocultar thumbs Ver también para PRIME 24:
Tabla de contenido

Publicidad

E.04
.04
E.04
.05
E.04
.06
E.04
.08
E.04
.10
E.04
.12
E.04
.13
Fan rotor blocked
E.04
.17
Gas valve control circuit fault
display.

10. DECOMMISSIONING

boiler has been shut.
11.

DISPOSAL

11.1 Disposal/Recycling

Check the sensor/board connection
SENSOR/CONNECTION ERROR
Check the sensor/board connection
INSUFFICIENT CIRCULATION
Check the electric connection of the gas valve
Check the gas valve calibration
Check the electric connections of the electrode
Check the status of the electrode
Check the connection between the board and the fan
15
FUME SENSOR FAULT
CHIMNEY OBSTRUCTION
FUME SENSOR FAULT
OTHER CAUSES
GAS SUPPLY
ELECTRODE PROBLEM
OTHER CAUSES
Check the earth circuit
BOARD/FAN ERROR
Change the air-gas unit
MAIN BOARD ERROR
7696305 (01-12/17)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Prime 1.24Prime 26Prime 28Prime 30

Tabla de contenido