1. Important Notes
The charger must be installed following the respective Installation
Guide, that is delivered with the charger.
Only energy meters that are delivered by Wallbox are compatible
with this feature.
Only qualified people are allowed to perform the installation as it is
described in this document.
Before the installation of Power Boost, the Wallbox must be
powered off and its cover removed. After, the Wallbox must be
properly closed, as defined in its Installation Guide.
4