Overhead Rigging - Briteq BTX-TITAN SIRIUS HRI 280 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
 Place the new lamp on the support by pressing it until the two metal supports maintains correctly the lamp.
 Switch the unit back on and use a DMX controller to point the open beam on a wall.
Attention: avoid looking at light coming directly from the lamp inside the unit, the UV-radiation of the lamp
is harmful for your eyes. (The light of the beam passes through a UV-filter first)
 You will see a hotspot in the beam projected on the wall. Adjust this hotspot using the screw as shown in
Fig. 6. The hotspot should be as much as possible in the center of the beam.
 Close the cover
 Done

OVERHEAD RIGGING

 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
 Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed at least 50cm from surrounding walls.
 The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
 Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
BRITEQ
®
Figure 6 - Hotspot correction screws
6/107
OPERATION MANUAL
BTX-TITAN

Publicidad

Tabla de contenido
loading

Tabla de contenido