Ventilation Kit - Renson Cbase Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Specific measures & safety measures:
• The Cbase
is built so that it is impossible to come in contact with live components during
®
normal operation without performing a conscious action.
• You should not be able to touch the ventilator by hand. A complete duct system has to be
connected to the ventilation unit before operating the system. The minimal length of a duct has
to be 1,5m.
• The appliance cannot be opened without proper tools.
• The Cbase
complies with legal demands for electrical appliances. The following specific
®
safety measures have to be taken into account:
• Make sure that the appliance is disconnected from the power grid when installing or making
changes to the ventilation system.
• Use adequate tools to perform repairs or maintenance on the Cbase
• Only use the appliance for its intended purpose.
• Always wait 30 sec when connecting the ventilation unit to the power grid.
Attention!:
The ventilation unit must operate continuously, this means that you may never
shut down the Cbase
®
2 • Ventilation kit
• 1 x Motor unit EX365CB
• 4 x sealing cap and/or Red Ø125> Ø80mm
• 2 x sealing cap Ø125
• 1 x Adaptor 125-150 mm (extraction)
• 1 x power cord (if applicable)
• 1 x manual
.
(legal obligation under NBN D50-001 Chapter 4.2. System C)
C
base
.
®
®
en
43

Publicidad

Tabla de contenido
loading

Tabla de contenido