SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación página 38

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4 Service
Internal Events
ID
Status
message
201–
208
209,
210
211
Low fan
speed
213–
215
216–
218
219–
221
225–
240,
275
241,
242,
245,
249
248
252–
254
243,
263
279
280
38
SHP75-10-STP60-10-IA-xx-18
Description
The internal temperature of the
inverter is too high.
Voltage in DC link is too high.
Fan speed is too low.
Internal error. Voltage
measured before and after the
relay differs too much.
Current measured on AC side
is too high.
Internal error. Voltage
measured before and after the
relay differs too much.
Failure in memory/EEPROM.
Internal communications fault.
Internal CPU error.
Current measured on AC side
is too high.
Internal error.
Temperature sensor error.
Self-test 24-hour timeout.
Self-test must run at least once
per 24 hours.
Measures
Verify that no objects or dust are on
top of the inverter and make sure
that the air ducts are clear and not
blocked.
If the event persists, reset the
inverter by disconnecting DC and
AC. If the event is repeated, check
the maximum PV voltage using the
display to see if it is above the limits.
Check whether the inverter fan is
blocked.
Contact the service.
Contact the service.
Contact the service.
Restart the inverter. If the event
persists, contact Service.
Restart the inverter. If the event
persists, contact Service.
Restart the inverter. If the event
persists, contact Service.
If the event repeats, contact Service.
Restart the inverter. If the event
persists, contact Service.
If the event persists, contact Service.
None.
SMA Solar Technology AG
DNO SMA
PV
Service
Line
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
x
-
-
-
-
Installation Guide

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60

Tabla de contenido