Maintenance - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4 Service
ID
Description
350–
Residual-current monitoring unit (RCMU)
352
self-test failed.
353
Current sensor test failed.
356–
Transistor and relay test failed or inverter
361
relay has failed (contact assumed
welded).
366
Residual-current monitoring unit (RCMU)
self-test failed.
Table 4.5 Events caused by the self-test

4.2 Maintenance

Ensure that the heat sink at the rear of the inverter is not
covered.
Clean the contacts of the PV load-break switch once a year.
Clean by cycling the switch to on and off positions ten times.
The PV load-break switch is located at the bottom of the
inverter.
For correct operation and a long service life, ensure free air
circulation for the following areas:
• around the heat sink at the top and side of the inverter
where the air exhausts, and
• towards the fan on the underside of the inverter.
To clear obstructions, clean using compressed air, a soft
cloth, or a brush.
The temperature of the heat sink can exceed 70°C.
40
SHP75-10-STP60-10-IA-xx-18
Measures
Contact the service.
Contact the service.
Warning: Do not operate the DC
load-break switch of the inverter.
Switching off the DC voltage using a
suitable DC load-break switch in the
Combiner Box is still possible. Do not
perform any further actions or switching
operations on the inverter. Contact
Service immediately.
Contact the service.
SMA Solar Technology AG
DNO SMA
PV
Service
Line
-
x
-
-
x
-
-
x
-
-
x
-
Installation Guide