Boom Setup; Up Pull Starting From Teepee Position - Greenlee G10 Tugger Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Boom Setup

Up Pull Starting from Teepee Position

1. Set the brakes.
2. Raise the forward boom as described under "Boom
Operation" until it is close to the angle desired for
the pull setup,
or
a. Lock the elbow detent pins in the fully inward
position.
b. Lower the boom (turn crank CW) until the nose
hits the oor.
c. Release the brakes and continue to lower the
boom while walking the carriage backwards
until the elbow is at the desired angle and lock it
in place.
Position Elbow to Desired Angle
3. Raise or lower the boom until the nose is just above
the conduit to be pulled from.
Position Nose Higher than Conduit
Greenlee Tools, Inc.
G10 Tugger™ Portable Cable Puller
To use slip-in couplings:
a. Insert the appropriate slip-in conduit adapter
b. Pivot the nose until the coupling is aligned with
c. Raise the boom until the bottom of the coupling
d. Release the brakes if not already released.
e. Roll the carriage forward until the coupling is
To use screw-on couplings:
a. Screw the appropriate screw-on adapter
b. Pivot the nose until it is aligned with the
c. Raise the boom until the bottom of the coupling
d. Release the brakes if not already released.
e. Roll the carriage forward until the nose is over
Insert Conduit Adapter and Raise above Conduit
Conduit
Conduit
15
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
coupling into the nose.
the conduit and lock in position.
clears the conduit.
over the conduit and lower it into the conduit.
coupling fully onto the conduit.
coupling and lock in position.
clears the conduit.
the coupling, pull the detent ring, and lower the
nose onto the coupling.
Lower into Conduit

Publicidad

Tabla de contenido
loading

Tabla de contenido