Boom Components - Greenlee G10 Tugger Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Boom Setup (cont'd)

Boom Components

Use these boom tubes only:
• Boom tubes supplied with the G10
• 3" rigid steel conduit (3 m or 10' maximum)
• 3" Schedule 40 pipe (3 m or 10' maximum)
If using 3" rigid conduit in place of the standard booms:
1. Insert the conduit while pulling out the detent rings.
2. Slide the conduit fully in and verify it is seated
through the sight holes.
3. Use 1/2"-13 screws (not supplied) in the weld nuts
to lock the conduit in place.
Detent Rings
Detent Rings
Greenlee Tools, Inc.
Sight Holes
Sight Holes
G10 Tugger™ Portable Cable Puller
18
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

Publicidad

Tabla de contenido
loading

Tabla de contenido