Cepex CPC004 Instrucciones De Instalación Y Operación página 21

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

PROGRAMING
4.2.6 Method of Even-Odd Activation over the Month -
A program for even-days irrigation over the month or odd-days irrigation over the month.
In this operation monthly irrigation days are selected, even days or odd days.
Days of the week can be blocked by selection.
• Switch the selector to weekly/cyclic/even-odd mode.
Press button -
-
until the symbol EVEn appears and the arrow –
– under the word
EVEn. On the display all the days of the week will light-up. You can select the days on
which there will be no irrigation.
• To cancel certain irrigation days in the week as required, press -
. The arrow will flash
underneath the day. Press -
- to the irrigation on that day of the week is cancelled.
For example
: If Sunday is cancelled then on Sundays no irrigation will take place.
Even when its date falls on an even day.
1
9

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Cpc006Cpc008

Tabla de contenido